HSE inspection report — no login required
HSE notice board updated and visible to all workers
Emergency contact numbers and evacuation plan posted on site
Toolbox Talk (TBT) conducted and attendance record available
HIRARC / JSA available and communicated for current work activities
Method Statements and Safe Work Procedures (SWP) available on site
Permit-to-Work (PTW) issued for high-risk activities (hot work, confined space, excavation, at-height)
Hard hats (helmets) worn by all personnel on site
High-visibility safety vests worn at all times
Safety boots (steel-toe) worn – no open-toe footwear
Hand gloves used for manual or abrasive work
Eye/face protection (goggles, face shield) used where required
Respiratory protection (dust mask / respirator) used where required
Full-body harness worn and anchored correctly for work at height (>2m)
Hearing protection used in high-noise areas
All openings, edges and floor voids barricaded and covered
Ladders secured at top and bottom, extending 1m above landing
Scaffolding erected, inspected and tagged by competent person
Safety nets / catch platforms installed where required
Mobile Elevated Work Platform (MEWP/aerial lift) inspected and operated by trained person
Scaffold base plates and sole boards in place
Scaffold bracing, ties and standards correctly installed
Scaffold planks fully decked, no gaps >25mm
Scaffold inspection tag current and valid
Safe load capacity posted on scaffold
Excavation edges barricaded / fenced with warning tape
Shoring or battering applied for excavations >1.2m depth
No workers inside unsupported excavation
Spoil stored minimum 1m from excavation edge
Underground utilities located and marked before excavation
All lifting equipment (crane, hoist, chain block) has valid certificate
Rigging gear (slings, shackles, hooks) inspected, tagged and within SWL
Lift plan / crane lifting plan prepared for critical lifts
Exclusion zone established and enforced during lifting operations
Appointed Lifting Supervisor present during lifting operations
No personnel suspended under or within swing radius of load
Temporary electrical installation inspected by competent electrician
Residual Current Device (RCD/ELCB) installed and functional
All electrical cables protected from damage, no bare wires
Distribution boards properly labelled and locked
Lockout/Tagout (LOTO) procedures in place for isolation
Hot Work Permit issued and approved
Fire watch posted during and 30 min after hot work
Fire extinguisher (COâ‚‚ / dry powder) available within 3m of hot work area
Flammable materials removed or protected from sparks/spatter
Welding screens in place to protect others from arc flash
Fire extinguishers available, inspected and not expired
Fire assembly point identified and clearly marked
No accumulation of combustible / flammable waste on site
Hot work and storage of flammables separated adequately
SDS (Safety Data Sheet) available for all chemicals used on site
Chemicals stored in designated, labelled, ventilated area
No open burning or uncontrolled dumping of hazardous waste
Spill containment measures (drip trays, absorbent) in place
Traffic management plan implemented – segregation of pedestrians and vehicles
Speed limit signs and traffic cones/barriers in place
Plant operators hold valid certificate of competency
Daily pre-start checklist completed for all mobile plant/equipment
Reversing alarms and mirrors functional on all vehicles/plant
Banksman/signaller present during reversing or restricted movement
Portable power tools inspected, PAT-tested and in good condition
Guards and safety devices on all power tools are intact and functional
Defective tools removed from service (tagged "Do Not Use")
Compressed gas cylinders chained upright and stored away from heat
Confined space entry permit issued and displayed
Atmospheric testing (Oâ‚‚, LEL, CO, Hâ‚‚S) conducted before entry and continuously
Attendant stationed outside confined space during work
Rescue equipment (harness, tripod, resuscitator) available at entry point
Site is clean, tidy and free from unnecessary obstructions
Walkways and access routes clear of materials and debris
Waste segregated (general, scheduled, recyclable) and labelled
Scheduled waste stored in designated area and manifested
First aid box stocked and easily accessible
At least one trained First Aider present on site
Emergency Response Plan (ERP) available and communicated
Nearest hospital route and emergency numbers known by site crew
Incident / near-miss reporting procedure communicated to all workers
All workers hold valid CIDB Green Card (or equivalent)
NIOSH / DOSH certifications available for relevant competent persons
New worker site induction completed before commencing work
Silt fencing / earth bund in place to prevent sediment run-off
No direct discharge of cement, oil or chemicals into drains
Noise and vibration controls implemented near sensitive receptors