New Site Inspection

HSE inspection report — no login required

New Inspection

HSE notice board updated and visible to all workers

Emergency contact numbers and evacuation plan posted on site

Toolbox Talk (TBT) conducted and attendance record available

HIRARC / JSA available and communicated for current work activities

Method Statements and Safe Work Procedures (SWP) available on site

Permit-to-Work (PTW) issued for high-risk activities (hot work, confined space, excavation, at-height)

Hard hats (helmets) worn by all personnel on site

High-visibility safety vests worn at all times

Safety boots (steel-toe) worn – no open-toe footwear

Hand gloves used for manual or abrasive work

Eye/face protection (goggles, face shield) used where required

Respiratory protection (dust mask / respirator) used where required

Full-body harness worn and anchored correctly for work at height (>2m)

Hearing protection used in high-noise areas

All openings, edges and floor voids barricaded and covered

Ladders secured at top and bottom, extending 1m above landing

Scaffolding erected, inspected and tagged by competent person

Safety nets / catch platforms installed where required

Mobile Elevated Work Platform (MEWP/aerial lift) inspected and operated by trained person

Scaffold base plates and sole boards in place

Scaffold bracing, ties and standards correctly installed

Scaffold planks fully decked, no gaps >25mm

Scaffold inspection tag current and valid

Safe load capacity posted on scaffold

Excavation edges barricaded / fenced with warning tape

Shoring or battering applied for excavations >1.2m depth

No workers inside unsupported excavation

Spoil stored minimum 1m from excavation edge

Underground utilities located and marked before excavation

All lifting equipment (crane, hoist, chain block) has valid certificate

Rigging gear (slings, shackles, hooks) inspected, tagged and within SWL

Lift plan / crane lifting plan prepared for critical lifts

Exclusion zone established and enforced during lifting operations

Appointed Lifting Supervisor present during lifting operations

No personnel suspended under or within swing radius of load

Temporary electrical installation inspected by competent electrician

Residual Current Device (RCD/ELCB) installed and functional

All electrical cables protected from damage, no bare wires

Distribution boards properly labelled and locked

Lockout/Tagout (LOTO) procedures in place for isolation

Hot Work Permit issued and approved

Fire watch posted during and 30 min after hot work

Fire extinguisher (COâ‚‚ / dry powder) available within 3m of hot work area

Flammable materials removed or protected from sparks/spatter

Welding screens in place to protect others from arc flash

Fire extinguishers available, inspected and not expired

Fire assembly point identified and clearly marked

No accumulation of combustible / flammable waste on site

Hot work and storage of flammables separated adequately

SDS (Safety Data Sheet) available for all chemicals used on site

Chemicals stored in designated, labelled, ventilated area

No open burning or uncontrolled dumping of hazardous waste

Spill containment measures (drip trays, absorbent) in place

Traffic management plan implemented – segregation of pedestrians and vehicles

Speed limit signs and traffic cones/barriers in place

Plant operators hold valid certificate of competency

Daily pre-start checklist completed for all mobile plant/equipment

Reversing alarms and mirrors functional on all vehicles/plant

Banksman/signaller present during reversing or restricted movement

Portable power tools inspected, PAT-tested and in good condition

Guards and safety devices on all power tools are intact and functional

Defective tools removed from service (tagged "Do Not Use")

Compressed gas cylinders chained upright and stored away from heat

Confined space entry permit issued and displayed

Atmospheric testing (Oâ‚‚, LEL, CO, Hâ‚‚S) conducted before entry and continuously

Attendant stationed outside confined space during work

Rescue equipment (harness, tripod, resuscitator) available at entry point

Site is clean, tidy and free from unnecessary obstructions

Walkways and access routes clear of materials and debris

Waste segregated (general, scheduled, recyclable) and labelled

Scheduled waste stored in designated area and manifested

First aid box stocked and easily accessible

At least one trained First Aider present on site

Emergency Response Plan (ERP) available and communicated

Nearest hospital route and emergency numbers known by site crew

Incident / near-miss reporting procedure communicated to all workers

All workers hold valid CIDB Green Card (or equivalent)

NIOSH / DOSH certifications available for relevant competent persons

New worker site induction completed before commencing work

Silt fencing / earth bund in place to prevent sediment run-off

No direct discharge of cement, oil or chemicals into drains

Noise and vibration controls implemented near sensitive receptors